Building a space for all of Doane's vocal, instrumental, and theatre performances.

Performing Arts Center

One roof. All Performances.

As part of Doane’s bold Our Time to Lead campaign, the Glenn Korff Performing Arts Center (PAC) is taking shape—bringing to life a vision of expanded opportunities, artistic excellence, and transformative student experiences.

Progress Goal ($100M)
84.5%

Theatre and Music for the future

The Glenn Korff Performing Arts Center (PAC) will include a renovation to the Music Department on the south side of the Communications Building and a new addition on the northeast side for a brand-new theatre.

The Theatre Addition will be three levels and approximately 24,000 square feet (SF). 

The Music Addition will include approximately 13,000 SF of new spaces and 6,000 SF of renovated space to ensure the building will meet the needs of the Music Department well into the future.

Pac Website 01
Northwest entrance to the theatre from the remodeled parking lot/plaza.
Pac Website 03

Theatre that's unrivaled

The theatre portion of the PAC includes a high-tech, black box theatre that can seat 223 people. All audience members will be greeted with a modern, comfortable viewing experience, and a carefully crafted sound experience will ensure the words from the stage reach all corners of the space. A walkable tension grid, various catwalks, and motorized line sets will create limitless possibilities more efficiently and safely.

A green room will serve the performers and backstage crew during productions and act as a meeting space at other times. Dressing rooms will serve each production by night and function as a laboratory or classroom space by day. Additionally, a scenery construction shop will allow scenery to flow almost effortlessly from the shop to the stage. 

Music making at it's finest 

The music addition and renovation will include a large rehearsal room, studio offices for teaching, a piano lab, a band room, a music education room, and two additional classrooms.

This renovation will introduce the Dr. Tom Tonniges Hall of Music in honor of the Doane Vagabonds.

The excitement doesn’t stop there. Band Director Andrew Feyes sees this as a game-changer for rehearsals, with more room to let creativity flow. “It’s going to have a massive ripple effect here at Doane,” he shared. And Choir Director Kurt Runestad couldn’t agree more, calling this moment a pivotal one in Doane’s story.

Pac Website 02

Cohesive and Collaborative Creativity

Construction is already underway on the music addition and renovation, located on the southeast corner of the Communications Building. 

Relative to fiscal year planning, the Music addition is scheduled to be completed in late spring/early summer of 2026, and the Theatre addition is scheduled for completion by late summer/early fall of 2026.

Construction cameras for this project can be viewed here

Pac Website 04

Ways to Give Your Support

While financial contributions are beneficial, you can also support Doane University and the campaign in other ways. Discover which one fits best for you!

Ready to help Doane lead by making your gift? Use our secure online giving platform below!

You may also email us or call us about your intended gift.

Together, we’ll help Doane lead the way and continue its more than 150-year tradition of academic excellence!

Skip to content